Go Back   Android Forums > Android Phones > HTC Magic



Reply
 
LinkBack Thread Tools
Old July 9th, 2009, 05:13 PM   #1 (permalink)
Junior Member
 
Join Date: Jun 2009
Location: pickering, ontario
Posts: 59
 
Device(s): Milestone (TELUS version )
Thanks: 0
Thanked 0 Times in 0 Posts
Default how do i change the order of words offered by predictive text on magic?

i love my phone, but the suggestions offered by predictive text drives me crazy sometimes! i would like to know how i change the order of the suggested words? for example, when i am using the t9 keyboard and i have predictive text on and i press #4 and #3 i am usually trying to type the word "if" or "he" but the word typed is "id" which is kinda stupid as this is a much less often used word. how do i change it this?

when i was using a s60 device i could open a new message and keep typing the same word over and over again until it started giving me the word i wanted as my first option.

any help would be appreciated, but please dont tell me to use the full keyboard as i prefer to use the phone keypad so i can text one-handed.

thanks

hondaguy is offline  
Reply With Quote
Sponsors
Old July 14th, 2009, 11:39 PM   #2 (permalink)
Junior Member
 
Join Date: Jun 2009
Location: pickering, ontario
Posts: 59
 
Device(s): Milestone (TELUS version )
Thanks: 0
Thanked 0 Times in 0 Posts
Default

any thoughts?
hondaguy is offline  
Reply With Quote
Old July 15th, 2009, 12:39 AM   #3 (permalink)
Member
 
Join Date: May 2009
Location: Victoria,BC
Posts: 292
 
Device(s): Rogers HTC Magic CM 5.0.8 Rogers Nexus One Stock 2.2 - FRF91
Thanks: 0
Thanked 1 Time in 1 Post
Default

I've been wondering that myself..
samuelmaskell is offline  
Reply With Quote
Old January 1st, 2010, 12:51 PM   #4 (permalink)
New Member
 
Join Date: Dec 2009
Posts: 6
 
Device(s): Sprint HTC Hero
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Ah, this has been driving me crazy too!

Anyone found an answer?
slapshot2940 is offline  
Reply With Quote
Old February 23rd, 2010, 10:24 PM   #5 (permalink)
New Member
 
Join Date: Feb 2010
Posts: 1
 
Device(s):
Thanks: 0
Thanked 0 Times in 0 Posts
Default

It would be great to have the HTC MyTouch's suggestions system! Sometimes I write stuff in Spanish and of course it totally misunderstands every single word. When I had the HTC MyTouch it preferred the "weird" word I was writing before changing it to an English word!

Let me know if you find a solution!!!
Tander is offline  
Reply With Quote
Old August 4th, 2011, 05:18 PM   #6 (permalink)
New Member
 
Join Date: Aug 2011
Posts: 1
 
Device(s):
Thanks: 0
Thanked 0 Times in 0 Posts
Tongue equally frustrated

It would be great if Android used frequency of actual use to promote the words used most often to the front of the list for ease of access. I can't tell you how many times I've sent the word 'of' instead of 'me' and 'if' instead of 'he'.
kewist is offline  
Reply With Quote
Reply

HTC Magic
Current Rating:
Rate this Phone:

The HTC Magic is the second EVER Android Phone and first launched on Vodafone in Europe on May 1st. With a sexy, slim form factor, 3.2 inch touchscreen and beautiful HVGA resolution, the Magic greatly increased the physical attraction to Android. ... Read More


Bookmarks


Go Back   Android Forums > Android Phones > HTC Magic User CP
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Jumping text on the suggested words (predictive text) paulshill Desire - Support and Troubleshooting 2 July 26th, 2011 05:46 PM
Can you skip words in predictive text? spffms Incredible - Support and Troubleshooting 6 June 15th, 2010 03:04 PM
App that allows you to change predictive text options etc.. GibsonD90 Android Applications 1 June 2nd, 2010 12:13 AM
Is there a way for predictive words to learn which ones i use most? JuniorNA Incredible - Support and Troubleshooting 4 May 18th, 2010 02:31 PM
Adding words to predictive list? mkhopper HTC Hero (Sprint) 6 November 12th, 2009 04:26 PM



All times are GMT -5. The time now is 04:56 AM.
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Custom vBulletin Skins by: Relivo


SEO by vBSEO 3.3.2 ©2009, Crawlability, Inc.